Designing a Two‐Floor Urban Traffic Tunnel by Using NATM Tunneling Method in Tehran Alluvium with Shallow Overburden under Modares Highway

  • Open or Close Aliakbar Golshani1, Baharak Alinejad2 and Sina Majidian3

    1Tarbiat Modares University, Iran

    2Tunnel Design engineer in geotechnical department of P.O.R engineering Consulting group, Iran

    3Geotechnical Engineering, Iran

    *Corresponding author: Aliakbar Golshani, Faculty of Civil and Environmental Engineering, Tarbiat Modares University, Iran

Submission: April 11, 2018; Published: May 10, 2018

DOI: 10.31031/ACET.2018.01.000508

ISSN 2639-0574
Volume1 Issue2

Abstract

In this paper construction of urban traffic tunnel in disturbed soil stratum based on New Austrian Tunneling Method (NATM) has been investigated. As a case study, Modares tunnel which is a part of Arash‐Esfandiar‐Niyayesh Project has been considered. This tunnel has been designed to connect and reduce the traffic volume between Modares highway and Niyayesh Highway in north of Tehran‐Iran. The ellipsoid shape of this tunnel, with two floors and the shallow depth, and its location in disturbed soil stratum, the large section of tunnel and the existence of embedded cannels makes Modares tunnel to be one of the sensitive parts of project. Dimensions of tunnel Excavation is 12.18m in width and 13m in height, with initial lining thickness of 35cm. Initial lining consists of 6, ∅32 micro‐piles, and 4, IBO R32S nails. The shotcrete of class C25 has been applied in initial support. Since Modares tunnel underpasses one of the most important main roads of Tehran, so the settlement amount has to be restricted. On the other hand, because the tunnel has been constructed in a shallow depth and considering the large dimensions of the section, we may encounter high ground settlements. To avoid these amounts of settlements, we use fore‐poling system to improve disturbed soil properties on top of tunnel, and micro‐ piles and nails for decreasing the vertical displacement amount. In this article we are intend to compare the results of the finite element model to monitoring results during construction and after that. Also we compare two numerical design alternatives for this tunnel from settlement perspective.

Keywords: NATM; Settlement; Fore‐poling; Micro‐pile; Nail support; Micropiles; chainage